Skip to content

Smart Waste Management

Collection is planned on static routes while generation is dynamic.

Fill-level prediction, route optimisation and vision-based segregation grading across the municipal network — with illegal dumping caught by change detection instead of by the complaint that follows it.

Smart Waste Management

Collection planned against what will be there, not what was there last month.

Fill-level prediction, route optimisation and vision-based segregation grading across the municipal network — with illegal dumping caught by change detection rather than by complaint.

  • Total waste

    0tons
  • Collected

    0%
    Good
  • Segregated

    0%
    Moderate
  • Recycled

    0%
    Moderate
  • Bins monitored

    0
  • Vehicles active

    0

Stream Composition

Today

Demo / Illustrative Data

Waste split by stream: wet organic 512 tons, dry recyclable 386, inert 244, unsegregated 81, hazardous 61.

Weekly Throughput

Generated · collected · recycled

  • Generated
  • Collected
  • Recycled

Waste generated, collected and recycled per day this week, with collection consistently around 91 percent of generation.

Collection Routes

Optimised each morning against predicted fill

4 active
  • Ward 11 — Sector 37

    6 vehicles · 214 bins · route optimisation saves 12%

    94%
  • Ward 12 — Sector 34

    5 vehicles · 188 bins · route optimisation saves 18%

    71%
  • Ward 18 — Udyog Vihar

    8 vehicles · 302 bins · route optimisation saves 9%

    88%
  • Ward 24 — Sector 56

    4 vehicles · 161 bins · route optimisation saves 21%

    62%

Optimised route — Ward 11

Bin Fill Prediction

24-hour forecast against actuals

  • Actual
  • Predicted

Bin fill rises from 34 percent at 6 AM to a predicted 94 percent by 9 PM, with predictions tracking actuals within two percentage points.

  • AI Route Optimisation

    Re-sequences collection runs each morning against predicted fill levels, traffic and vehicle availability.

    14% fewer vehicle-kilometres

  • Bin Fill Prediction

    Forecasts fill state 24 hours ahead from historical curves, weather and local event calendars.

    88% prediction accuracy

  • Waste Classification

    Computer vision at transfer points grades segregation quality and flags contaminated loads.

    9 stream classes

  • Collection Monitoring

    Vehicle telemetry and bin-lift events reconcile what was planned against what was actually collected.

    Live vehicle tracking

  • Illegal Dumping Detection

    Drone and CCTV imagery flag new accumulation against a rolling baseline of each site.

    Change detection alerts

Capabilities

What the waste module actually does

  • Fill-level prediction

    Twenty-four hour forecasts per bin from historical curves, weather and local event calendars, so a route is planned against what will be there.

  • Route optimisation

    Daily re-sequencing against predicted fill, traffic and vehicle availability, reducing vehicle-kilometres without reducing service coverage.

  • Segregation grading

    Computer vision at transfer points grades source segregation quality and flags contaminated loads before they reach a processing facility.

  • Collection assurance

    Vehicle telemetry and bin-lift events reconcile what was planned against what was actually collected, closing the gap between the roster and reality.

  • Illegal dumping detection

    Drone and CCTV imagery compared against a rolling baseline per site, so new accumulation is caught by change detection rather than by complaint.

  • Facility throughput

    Material recovery and processing facilities monitored on input, output and diversion rate, giving the municipality a defensible recycling figure.

Contact

Start a conversation about your environmental data.

Tell us what you monitor today, what you are required to report, and where the chain currently breaks. We will come back with what a deployment would look like.

MANTRAMIND

Nature & Science in Harmony

T11, 1501Takshila HeightsSECTOR 37CGurugram, Haryana – 122001
District Gurugram, Haryana
GST 06AAVCM0278L1ZU

Contact details available on request.

Enquiry form

Demo form — connect backend before production

No data is transmitted. Validation runs entirely in the browser.